Drayton Lane Road Works

road-works-signjpg

Temporary closure of Drayton Lane, Oving CP,

6th July 2025.

NOTICE IS HEREBY GIVEN that from the date specified below, West Sussex

County Council has temporarily closed to all traffic, Drayton Lane, Oving CP, in the Chichester

District under Section 14(2) of the Road Traffic Regulation Act 1984, as amended, on Drayton

Lane for a distance approx 682 metres.

The temporary closure is scheduled to commence on 6th July 2025 for up to 5 days (it is

estimated to be completed on 6th July 2025) and is required for the safety of the public and

workforce while BT undertakes a daytime road closure between the junctions with Oving Road

and Tangmere Road for pole replacement and testing works.

The restriction will be in place off-peak only from 09:30 until 15:30

An alternative route will be signed on site but please visit https://one.network/?tm=142899169

for more details.

Access maintained for emergency services, residents and pedestrians.

For information regarding this closure please contact Sunbelt Rentals on behalf of BT on 03700

500792 who will able to assist with scope of these works.

Temporary closure of Drayton Lane, Oving CP,

21st July 2025.

NOTICE IS HEREBY GIVEN that from the date specified below, West Sussex

County Council has temporarily closed to all traffic, Drayton Lane, Oving CP, in the Chichester

District under Section 14(2) of the Road Traffic Regulation Act 1984, as amended, on Drayton

Lane at the level crossing.

The temporary closure is scheduled to commence on 21st July 2025 for up to 5 days (it is

estimated to be completed on 22nd July 2025) and is required for the safety of the public and

workforce while Network Rail Infrastructure Ltd undertakes track maintenance. Road to be

closed between junction with Oving Road and Drayton Lane Roundabout.

The restriction will be in place overnight only from 23:59 until 05:30

An alternative route will be signed on site but please visit https://one.network/?tm=142291255

for more details.

Access will not be maintained during works and the diversion route will need to be followed.

For information regarding this closure please contact Network Rail Infrastructure Ltd on 03457

11 41 41 who will able to assist with scope of these works.

Dated: 30th June 2025

Matt Davey

Assistant Director of Highways, Transport and Planning